The ore gantries are equipped with a grab and they are intended for bulk cargoes handling, including sintered iron ore, coke, iron-ore pellets and coal. The ore gantries have the increased lifting capacity, bigger hoisting height (in some cases up to 50 meters), sufficiently increased trolley speed and span length up to 120 meters. Depending on handling operations specifics, the ore gantry can be equipped with a rope bucket grab, a removable electromechanical (electro-hydraulic) grab.