News
MATERIALS HANDLING EQUIPMENT
+7 (812) 718-82-82
Ru
MATERIALS HANDLING EQUIPMENT
MENU
About Tehnoros
News
History
Approval documents
References
Presentations
Brochures
Photo Gallery
Videos
Industry Solutions
Ship building and ship repair
Ports and cargo terminals
Container terminals
Metallurgy
Power industry
Mining
Offshore
Products
Hoisting equipment
Portal cranes
Container cranes
Gantry and semi-gantry cranes
Special bridge cranes
Metallurgical cranes
Mine bridge cranes
Jib cranes
Bulk materials handling equipment
Waterfront equipment
Equipment for railway loading complex
Storage and other conveying equipment
Ship building and ship repair equipment
Services
Engineering services
Installation supervision
After-sales service
Questionnaires
Articles
Contacts
About Tehnoros
News
History
Approval documents
References
Presentations
Brochures
Photo Gallery
Videos
Industry Solutions
Ship building and ship repair
Ports and cargo terminals
Container terminals
Metallurgy
Power industry
Mining
Offshore
Products
Hoisting equipment
Portal cranes
Container cranes
Gantry and semi-gantry cranes
Special bridge cranes
Metallurgical cranes
Mine bridge cranes
Jib cranes
Bulk materials handling equipment
Waterfront equipment
Equipment for railway loading complex
Storage and other conveying equipment
Ship building and ship repair equipment
Services
Engineering services
Installation supervision
After-sales service
Questionnaires
Articles
Contacts
Abaut company
News
History
Approval documents
References
Presentations
Brochures
Photo gallery
Videos
News
09 January, 2018
Installation of special gantry crane KK-SP 560(280+280)/60(30+30)/5-13,5-15,5/52,5/35-A2,U1-SS was started
29 December, 2017
Two container cranes were put into operation at the Kleshikha station of West Siberian Railway
21 December, 2017
Merry Christmas and Happy New Year!
01 December, 2017
Portal crane "Zubr-800" with lifting capacity 32 tons was put into operation at the Port of Dudinka
11 October, 2017
"TEHNOROS" will participate in the 23rd International industrial exhibition "Metal-Expo"
25 August, 2017
"Tehnoros" shipped 2 boats KS-110-35 and KS-162
10 July, 2017
Special gantry crane KK-SP 560(280+280)/60(30+30)/5-13,5-15,5/52,5/35-A2,U1-SS was put into production
04 July, 2017
Engineering bureau “TEHNOROS” completed development of a range of ship-loading rotary machines such as "Kuban" with a swinging boom
14 June, 2017
Manufacturing of 8 bridge electric cranes was started
26 May, 2017
Two bridge grab cranes KMESG 32-40-А8 were put into operation
02 May, 2017
The results of MiningWorld Russia-2017
24 April, 2017
11th annual conference “Logistics of chemical market of Russia ChemoLogic'2017”
22 February, 2017
Portal crane ZUBR-550-m was put into operation
11 July, 2016
Special crane KMEST 30/5-28-12,7K was put into operation
04 July, 2016
The production run of traverses with lifting capacity from 29 to 120 tons is completed
30 May, 2016
New shiploader, manufactured by "Tehnoros", was put in commission at the "EuroChem" terminal
12 May, 2016
Conference and exhibition SOLIDS RUSSIA 2016
05 May, 2016
The manufacture of a ship handling trolley with lifting capacity of 170 tones is completed
29 April, 2016
The results of 20th International Exhibition MININGWORLD RUSSIA -2016
27 April, 2016
The bridge metallurgical crane 120+32/10-24,5-A8 is commissioned
First
Pages:
1
2
3
4
5
Last
All
Show by:
20
50
100